Beaird Drilling, a JE Dunn team member providing self-performing concrete services, drills perimeter piers around the foundation perimeter of the Lavaca Street office building. The piers will support structural members. The photo shows an A250 drill rig, used to drill each of the six piers to a depth of 120 feet.